Font Sizer

Search for Clients and Projects

Search results for "BPA":

ProjectClientWhen
Update of Bonneville Power Administration Measurement and Verification Protocols Bonneville Power Administration 2010
Residential and Commercial Lighting Program Assessment, Bonneville Power Administration Bonneville Power Administration 2010
Residential Performance Tested Comfort Systems and HVAC Research Bonneville Power Administration 2010
Assessment of New Opportunities for Energy Efficiency Programs and Technologies Bonneville Power Administration/Quantec LLC 2007
Refrigerator Replacement Program Process Evaluation Bonneville Power Administration 2006
Process Evaluation of Bonneville Power Administration Conservation Augmentation Program Bonneville Power Administration 2005
Assessment of Conservation Staffing Needs Bonneville Power Administration/Quantec LLC 2002

Page #1 of 1  

home | our vision | projects | clients | our team | contact
copyright © 2009 research into action, inc.
Follow Research Into Action on Twitter Follow us on Twitter
Become our fan on Facebook

Project: Update of Bonneville Power Administration Measurement and Verification Protocols

Bonneville Power Administration

In 2009, the Bonneville Power Administration contracted with a team led by Research Into Action to review and, as warranted revise, its existing measurement and verification (M&V) protocols, which were developed between 1999 and 2003. In its review, the team considered: Are the types of assessments that BPA needs covered by the existing protocols? Are the existing protocols consistent with best practices? Do any of the protocols need to provide more information to guide practitioners so that the assessment is consistent with the protocol? The team recommended the consolidation of several protocols into single, more comprehensive protocols, and a rewrite of all the protocols requiring post-installation measurements to be consistent with International Performance Measurement and Verification Protocol (IPMVP) standards. The team then launched the rewrite of the protocols, and created two "light" protocols for smaller projects for which post-installation measurement is not cost-effective. The team developed examples to illustrate the protocol from development of a plan through final analysis and resource guides in the areas of sampling of data points and regression modeling. The team trained BPA energy efficiency engineers in using the revised protocols. The project addressed issues such as data and personnel training requirements, cost, cost-effectiveness, and accuracy that users must consider when deciding which M&V practices to use, as well as the opportunities offered by advances in metering to conduct measurements that previously were not cost-effective.